Design Memos
Design memos are listed by topic. They open in PDF format. Signed originals of the following memos are filed in the Helena Construction and/or Design Office.
 
Bridge Memos Released
Access to Bridges 02/14/05
Salvaged Bridge Material 09/30/03
Vertical Clearance Railroad Separations 06/19/03
Structure Excavation on End Bents as a Pay Item 10/03/00
 
Curb and Guardrail Memos Released
Guardrail End Section Widening 11/26/08
Public Interest Finding on Guardrail Terminal Sections and Impact Attenuators 12/19/07
Bridge Approach Guardrail Details 09/17/07
W-Beam Guardrail Reassessment of the BCT 07/31/07
Median Concrete Curb - Type B 07/26/07
Concrete Median Barrier Rail 08/27/03
 
Detours and Crossovers Memos Released
MDT Median Crossovers (Interstate) Procedures & Guidelines 05/14/08
MDT Median Crossover Policy and Procedure 05/14/08
Milling Tapers 11/02/05
Temporary Detours 07/01/03
 
Erosion Control Memos Released
Permanent Erosion & Sediment Control Design Guidelines 12/28/05
 
Fencing and Right of Way Memos Released
Wildlife Fence Issues 04/06/07
MDT Fencing Policy and Procedure (Non-Interstate) 04/10/06
Retracement Surveys - a guideline for RW Plans 08/11/05
R/W Bureau Red Line Process 12/05/02
 
Grading Memos Released
Mass Diagram 07/07/08
Haul Quantities 12/21/07
Embankment-in-Place 11/27/06
Back Slope Rounding 01/27/03
Placing Soils Information on Road Plans 11/18/01
 
Hydraulic Memos Released
Alternative Culvert Pipe Material Selection Guidelines 06/12/07
Alternative Culvert Pipe Material Selection Guidelines
Part B
06/12/07
Culvert Excavation - Clarification 11/27/06
Culvert Excavation 11/17/06
Guidelines for Hydraulic Report Data as Requested by the DFWP 05/18/05
Hydraulic Reports 04/05/05
DEQ Storm Drain/Water Main Requirements 06/15/04
Water Resources Investigations Report 03-4308: USGS - Methods for Estimating Flood Frequency in Montana Based on Data through Water Year 1998 03/29/04
Pipe Cleaning 09/05/03
Culvert and Trench Excavation 07/24/02
 
Miscellaneous Memos Released
Road Design Manual - Chapter 9: Superelevation 01/08/07
Intelligent Transportation Sytems (ITS) 01/30/07
ADA Ramps - Truncated Domes 01/07/05
Context Sensitive Solutions on Projects 10/23/03
Speciality Items 04/25/02
 
Pavement Memos Released
Plant Mix Special Provisions 06/06/08
Aggregate Treatment 02/28/08
Tack and Aggregate Tack Quantities 01/08/08
Fog Seal 12/28/07
PG 64-34 Asphalt Binder 07/26/06
Revised Surfacing Structural Coefficients and Layer Thicknesses 05/11/06
Isolation Lifts 12/14/05
Surfacing Design Guidelines 04/07/05
Cover Material Revision Asphalt Cement Quantities 06/29/04
Widening Projects - Vertical Notch 04/12/04
Colored Concrete 12/15/03
Aggregate Treatment 07/28/03
Aggregate Treatment 07/23/03
Isolation Lifts and Tack in the Payment for Plant Mix 06/29/05
Asphalt Cement Content in Grade S Plant Mix 05/15/02
 
Plan Preparation Memos Released
Worker Visibility 11/16/07
Project Limits 01/05/07
Horizontal Curve Data 11/29/06
Special Provision 07/31/06
Summary Subtotals 04/06/06
Quantity Splits Reference Guide for Designers 11/04/05
Quantity Splits 10/14/05
Plans Change Clear Zone Table 08/23/05
Road Design Manual Revision 03/09/05
Title Sheet - Design Data 01/10/05
Project Connections to the Existing Roadway 08/21/02
Curb Dimensions 04/30/08
Contract Time Calculation Procedures 06/03/08
 
Signing and Marking Memos Released
Pavement Marking Quantities 07/20/06
Temporary Pavement Markings 03/27/06
Rumble Strip Policy Revision 09/30/04
Temporary Pavement Markings 01/16/04
Reflectors on Concrete Barrier 01/28/03
Pavement Maring Quantities 04/10/02